  1. A presentation On AIR POLLUTION DUE T0 CONSTRUCTION Presented by- Rahul chaudhary B. Tech, C E(4th year) Roll- 1436000096 Submitted to : Department of Civil Engg. G I…
Related documents
Share
Transcript
  • 1. A presentation On AIR POLLUTION DUE T0 CONSTRUCTION Presented by- Rahul chaudhary B. Tech, C E(4th year) Roll- 1436000096 Submitted to : Department of Civil Engg. G I T M Lucknow
  • 2. Air pollution is a change in the physical, chemical and biological characteristic of air that causes adverse effects on humans and other organisms. The ultimate result is a change in the natural environment and/or ecosystem. What is Air Pollution?
  • 3. Types of Air Pollutants: Major primary pollutants produced by human activity include: i. Sulphur oxides (SOx) ii. Nitrogen oxides (NOx) iii. Carbon monoxide iv. Carbon dioxide (CO2) v.Volatile organic compounds
  • 4. Secondary pollutants include: 1) Smog 2) Ground level ozone (O3) 3) Peroxyacetyl nitrate (PAN)
  • 5. Pollution due to Construction
  • 6. Prevention of environment From the constructional pollution Loading, Unloading or Transfer of Dusty Materials Wet dusty materials with water spraying prior to operation.
  • 7.  Enclose the belt conveyor from the top and the 2 sides.  Enclose the transfer point between conveyors.  Install belt scraper and bottom plates.  Maintain vertical distance between belt conveyor outlet and material landing point at <1 m.  Enclose the unloading area. Transfer of Dusty Materials with a Belt Conveyor System Transfer point enclosed
  • 8. Drilling, Cutting & Polishing, etc  Spray surface continuously with water.  Equip with effective dust extraction and filtering device.
  • 9. Blasting  Wet area within 30 m before blasting.  No blasting during the strong wind signal or tropical cyclone warning No.3 or above is hoisted unless permitted by Commissioner of Mines.
  • 10. Construction of the Superstructure of Building  Provide effective dust screen where a scaffolding is erected.  Enclose the skip hoist.
  • 11. THANK S
  • Related Search
    We Need Your Support
    Thank you for visiting our website and your interest in our free products and services. We are nonprofit website to share and download documents. To the running of this website, we need your help to support us.

    Thanks to everyone for your continued support.

    No, Thanks